Changing a Machinery Order After Indonesian Import-Facility Approval: Which Records Must Be Amended?

If your supplier changes a machine’s model or specifications after Indonesia has approved import-duty relief, compare the revised order with the issued duty-exemption decision and its machinery list, often called the Masterlist. If the replacement changes an approved detail, check whether the decision can be amended before dispatch. Review any separate tax certificate or import approval the factory plans to use for the shipment.

Compare the revised model with the issued machinery line

Suppose a factory’s supplier discontinues the injection molding machine named in the order and offers a model with a higher output. The factory is still preparing to begin commercial production, and the machine covered by the proposed change has yet to be imported. Ask the supplier for a revised order or contract, a specification sheet for the replacement, and the reason for the change.

Put the revised order beside the original duty decision, any earlier amendments, and the affected machinery line. Compare the description and technical specifications, quantity and unit, value, country of origin, and unloading port. Reassess the Harmonized System (HS) classification against the new specifications with the Indonesian tariff classification guide.

Investment Regulation No. 5 of 2025, Article 256(2), covers requests to change, replace, or add machinery and to change details such as the tariff code, specifications, value, unit, port, or country of origin. Record the entries affected by the replacement. If the revised machine serves a different production role or raises an eligibility question, check the qualifying machinery and project conditions before relying on the facility.

Check the project stage and assemble the evidence

Annex XV, row 2, lists the evidence for amending a machinery duty-exemption decision. It includes the decision to be amended and a recap of machinery imports already made. The company’s directors sign a statement explaining the change, with the applicable stamp duty, and state that the business activity has yet to enter the commercial stage and the machine being changed has yet to be imported. Check both facts before proceeding with this application. Official machinery amendment requirements, page 475

Use the supplier’s contract or technical materials to explain what changed. The annex lists technical records such as the invoice, packing list, transport document, contract, or machinery brochure. For the replacement machine, use the old and new specifications to explain its role in the licensed production process and the effect on capacity. Include the process flow, updated capacity calculation, factory layout or technical drawings, and calculation of machinery needs.

The annex has extra evidence requirements for machinery subject to trade restrictions and for used capital goods. Check which commodity balance, technical consideration, or recommendation applies. Include a surveyor report where the trade rules require one.

File while the duty decision is still valid

Article 256(4) requires the amendment application before the existing decision expires. In the Annex XVI decision format, the end date appears under Masa Berlaku Fasilitas (facility validity). The business submits through Online Single Submission (OSS), Indonesia’s business licensing system. Under Article 257, officials check the application and may seek technical clarification. It can proceed, be returned for correction, or be rejected.

Article 258 requires a site visit for applications involving machinery modernization, rehabilitation or restructuring, or goods and materials. A virtual visit is possible if an in-person visit cannot be held.

Use issuance of the amended decision as the dispatch check for a shipment that will rely on the amended relief. The Investment and Downstream Industry Minister, who heads the Investment Coordinating Board, issues the duty decision on the Finance Minister’s behalf. Give the customs broker the issued record and the matching invoice and packing list.

Under Article 7 of Customs Regulation PER-10/BC/2022, as amended by PER-13/BC/2026, the quota check compares the declaration with the decision available in Sistem Indonesia National Single Window (SINSW), Indonesia’s national single window system. Before filing, have the broker match the decision number and date, goods item number, customs office, goods type and applicable specifications such as brand, type, or size, and quantity and unit. Check the remaining balance against the quantity about to ship.

Recheck the producer-import requirements for the replacement using its exact tariff code, specifications, and condition as new or used. If the product rule requires a Persetujuan Impor (PI), or import approval, establish whether the issued PI still covers the goods. Check the applicable trade approval requirements and whether a surveyor report is required before relying on the shipment plan.

Check the separate value-added tax certificate

If the factory is using a Surat Keterangan Bebas Pajak Pertambahan Nilai Barang Kena Pajak tertentu yang bersifat strategis (SKB PPN), the value-added tax (VAT) exemption certificate for specified strategic taxable goods, check the type and scope of the certificate it holds. The guide to duty and VAT approvals explains those records. If the certificate has a Rencana Kebutuhan Impor dan Perolehan (RKIP), or import and acquisition requirements plan, compare the plan with the replacement and the way it will ship.

Under Article 15 of Finance Regulation 115/PMK.03/2021, the plan distinguishes complete machinery from machinery imported in disassembled form. For disassembled machinery, the plan must name the machine and identify the component types and their HS codes. Without the required component types, the certificate cannot be used to claim the VAT exemption on that import.

Article 16 allows specified additions to the plan under the certificate routes in Article 11(1)(a) or 13(6)(a). Examples include adding machine types or quantities, an arrival port, or component details when the machine was originally to arrive complete. For the duty-linked certificate, Article 16(2) ties those additions to granted duty relief. If a Masterlist amendment is needed to cover the addition, obtain that approval before applying to change the VAT plan. An eligible applicant requests the change from the Director General of Taxes through SINSW and checks for electronic approval of the revised plan.

Check whether the replacement fits a listed change. If you amend the plan, verify before filing the import declaration that the approved revised RKIP and the valid SKB PPN together cover the shipment. If the certificate has no relevant plan or the substitution falls outside those additions, confirm which tax procedure applies before claiming the exemption.

Leave a Reply

Your email address will not be published. Required fields are marked *

Share with